    17 Battery Place New York, New York

    Prospective tenant representative: School Construction Authority
    Project engineering company: Fiskaa engineering
    Project 17 Battery Place Description: Performed wet tapping on chilled water 12’’ supply and return risers, using 4’’ copper tubing, ball valves and balancing valves. Leaving lines ready for equipment connection.
    As part of the HVAC system 2 ½’’ copper tubing, a heat ex-changer, two pumps, expansion tank and corresponding valves and gauges were installed as well in the designated commercial space mechanical room. It also included some demolition of existing electrical conduit, metal doors, concrete slab in fills, installation of metal doors and hardware as well as new wiring for light fixtures.

    • State

      New York
    • Client

      Newmark Grubb Knight Frank
    • Prospective tenant representative

      School Construction Authority
    • Project engineering company

      Fiskaa Engineering